Light-guiding pillar and vehicle lamp using the same

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9903553
SERIAL NO

15054703

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A light-guiding pillar used in a vehicle lamp includes a major structure and a light-guiding structure. The major structure has a light incident surface, a light outgoing surface, an upper surface, and a bottom surface. The upper surface and the bottom surface are disposed between the light incident surface and the light outgoing surface, in which the upper surface and the bottom surface are opposite to each other. The major structure is configured to guide a portion of a light beam entering the major structure through the light incident surface to the light caving surface. The light-guiding structure is disposed on the upper surface and configured to guide another portion of the light beam entering the major structure through the light incident surface from the upper surface to the bottom surface with passing through the bottom surface.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
LEXTAR ELECTRONICS CORPORATION6F NO 21 LIXING RD HSINCHU SCIENCE PARK HSINCHU 300094

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Lin, Mong-Ea Taichung, TW 15 57
Lin, Shih-Kai Tainan, TW 44 130
Lin, Yu-Min New Taipei, TW 98 526

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Aug 27, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Aug 27, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00