Projection lens and projection device thereof

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9904041
SERIAL NO

15220372

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A projection lens is applied to image projection of a projection device including an imaging unit. The projection lens includes a first lens group with a negative diopter and a second lens group with a positive diopter. The first lens group has a first lens having a first negative diopter. The second lens group is adjacent to the imaging unit and includes second, third, fourth, and fifth lenses. The second lens has a second negative diopter. The third and fourth lenses are between the first and second lenses. The fifth lens is between the imaging unit and the second lens and is an aspherical lens. A refractive index of the first lens is less than or equal to 1.64. An ABBE number of the first lens represents Vd1, an ABBE number of the second lens represents Vd2, 0.4≦Vd2/Vd1≦1.2, and Vd1<50.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
QISDA CORPORATIONNO 157 SHANYING RD GUISHAN DIST TAOYUAN CITY 333
QISDA OPTRONICS (SUZHOU) CO LTD215011 NO 169 SUZHOU HI TECH DEVELOPMENT ZONE JIANGSU ZHUJIANGLU ROAD SUZHOU CITY JIANGSU PROVINCE 215011

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Lin, Ming-Kuen Taoyuan, TW 62 74

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Aug 27, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Aug 27, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00