Drive controller, driving system, and drive control method

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9904261
SERIAL NO

14599790

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A drive controller includes a speed compensation unit that performs a speed compensation for an object based on a result of comparison made by a speed comparator that compares a current speed of the drive object with a speed indicated by a speed command. The speed compensation unit includes a position-information-based speed gain setting unit that sets a position-information-based variable gain based on position-information-based speed gain information representing a relationship between a position of the object and position-information-based variable gain that varies depending on a load torque of the motor when the object is present at a predetermined position, and a speed compensation processor that performs a speed compensation based on a result of the comparison in the speed comparator and the position-information-based variable gain set by the position-information-based speed gain setting unit.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
MITUTOYO CORPORATIONKAWASAKI-SHI KANAGAWA 213-8533

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Igasaki, Shiro Kawasaki, JP 17 83

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Aug 27, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Aug 27, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00