Semiconductor devices and methods for forming the same

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9905480
SERIAL NO

15420409

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A method includes forming a first nitride layer on a semiconductor substrate, forming a first oxide layer on the first nitride layer, forming a first trench through the first oxide layer, the first nitride layer and a portion of the semiconductor substrate, forming a first spacer on a sidewall of the first trench, forming a second trench in the semiconductor substrate by using the first spacer as a mask, forming a third trench, forming a second oxide layer in the second trench, wherein the second oxide layer laterally extends into the semiconductor substrate and under the first spacer, forming a second spacer on a sidewall of the third trench, and removing a portion of the first nitride layer and a portion of the semiconductor substrate by etching and using the second spacer as a mask to form a fin structure on the second oxide layer.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • NUVOTON TECHNOLOGY CORPORATION

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Wen, Wen-Ying Hsinchu County, TW 28 112

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Aug 27, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Aug 27, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00