Plug connector having crosstalk compensation

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9905972
APP PUB NO 20160056579A1
SERIAL NO

14780439

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A plug-in connector that can be manufactured using MID technology, which nevertheless ensures good crosstalk compensation and thus a high data transmission rate has two assembled contact carrier parts with contacts are disposed between these contact carrier parts. A separate, electrically conductive compensation coating may be provided in each contact carrier part, each having a connection surface for producing an electrically conductive connection to an associated contact. Each of the electrically conductive compensation coatings has at least one coupling surface for a targeted capacitive coupling with one or more further contacts. Between each coupling surface and the associated contact, an insulating film or part of an insulating film is provided, which acts as a dielectric and a spacer. By selection of the contacts to be coupled and the capacitance of the coupling, good compensation of undesired crosstalk can thus be achieved in a simple manner.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • HARTING ELECTRONICS GMBH

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Lindkamp, Marc Luebbecke, DE 20 150
Schulte, Michael Cologne, DE 69 670

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Aug 27, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Aug 27, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00