Optimized high current connector pattern for PDB

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9905985
SERIAL NO

14740923

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A power distribution box assembly may include a housing, a circuit board disposed in the housing, a plurality of electrical components attached to the circuit board, and/or a plurality of electrical traces attached to the circuit board and configured for electrically connecting the plurality of electrical components to at least one of another electrical component of the plurality of electrical components and an electronic control unit. A power distribution box assembly may include a wiring harness connector connected to the housing. In embodiments, a wiring harness connector may include a connector housing and a plurality of connector terminals that may be configured for electrical connection with the plurality of electrical components. A plurality of electrical components may be disposed relative to the circuit board in a manner that minimizes at least one of a number, a length, and a volume of the electrical traces.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • LEAR CORPORATION

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Darr, Christopher Livonia, US 3 3
Gawron, Steven Plymouth, US 2 14
Kowtun, Peter Plymouth, US 14 90
Nelson, Kent Southfield, US 3 6
Pajtas, Dennis Hartland, US 2 10
Pierik, Bruce Hazel Park, US 6 33

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Aug 27, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Aug 27, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00