Consensus-based power control apparatus

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9906033
SERIAL NO

14702844

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A consensus-based power control apparatus is provided, which includes a real power control module and a reactive power control module. A real power consensus signal between a first power generating apparatus and a second power generating apparatus is provided and a frequency restoration signal is generated according to the real power consensus signal, thereby allowing the real power control module to generate a real power output signal. A reactive power consensus signal between the first power generating apparatus and the second power generating apparatus is provided and a voltage differential restoration signal is generated according to the reactive power consensus signal, thereby allowing the reactive power control module to generate a reactive power output signal. Therefore, the invention can control real power and reactive power input signals (i.e., actual real power and reactive power outputs) of the first power generating apparatus in a grid system.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
NATIONAL TSING HUA UNIVERSITYNO 101 SECTION 2 KUANG-FU ROAD HSINCHU

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Chu, Chia-Chi Hsinchu, TW 29 201
Lu, Lin-Yu Hsinchu, TW 2 4

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Aug 27, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Aug 27, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00