Decentralized generator control

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9906041
SERIAL NO

15071512

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The present disclosure pertains to distributed controllers configured to control a plurality of electrical generators in an electrical generation and distribution system. In one embodiment, a distributed controller consistent with the present disclosure may include a communication subsystem to obtain a first plurality of time-stamped electrical parameter measurements from a first node. A measurement analysis subsystem may compare the first plurality of time-stamped electrical parameter measurements and the second plurality of time-stamped electrical parameter measurements. The first node and the second node may be associated in an electrical island by a topology detection subsystem based on the correlation. A control subsystem may be configured to implement a control action based on the association of the first node and the second node in the electrical island.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
SCHWEITZER ENGINEERING LABORATORIES INC2350 NE HOPKINS COURT PULLMAN WA 99163

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Manson, Scott M Moscow, US 34 269
Raghupathula, Sai Krishna Pullman, US 4 33
Ravikumar, Krishnanjan Gubba Pullman, US 4 33

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Aug 27, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Aug 27, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00