Power supply circuit and power supply method for switching power supply

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9906140
SERIAL NO

15148220

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A power supply circuit for a switching power supply including a power switch configured to receive a DC input voltage, can include: a switching control circuit configured to receive a charge voltage signal of a charge capacitor, a reference voltage signal, and a PWM control signal, and to generate a switching control signal; a control unit having a supply voltage from the charge capacitor, where the charge capacitor includes a first terminal coupled to the switching control circuit, and a second terminal coupled to ground; and where when the switching power supply is in a start-up phase, the power switch is turned on, the first switch is turned off, and the DC input voltage charge the charges capacitor through the power switch, and the control unit begins operating when the charge voltage signal reaches a level of starting voltage of the control unit.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
SILERGY SEMICONDUCTOR TECHNOLOGY (HANGZHOU) LTDHANGZHOU

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Bai, Yongjiang Hangzhou, CN 24 191
Hu, Zhiliang Hangzhou, CN 20 181
Jin, Jin Hangzhou, CN 39 246
Zhang, Shaobin Hangzhou, CN 17 105

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Aug 27, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Aug 27, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00