Method and apparatus for determining intermediate routing node and system

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9906435
SERIAL NO

15333500

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A method for determining an intermediate routing node, including: determining at least one intermediate routing node that is used to transfer to-be-transmitted data between the two routing nodes when there is a fault in a communication path between two routing nodes, adding a channel dependency relationship between a to-be-verified intermediate routing node and the two routing nodes to a channel dependency graph of a routing network in which this fault has not occurred in order to enable the channel dependency graph to become an updated channel dependency graph, and determining the to-be-verified intermediate routing node as a final intermediate routing node that is used to transfer the to-be-transmitted data when the updated channel dependency graph does not have a dependency relationship loop. The determined intermediate routing node can be used to transfer to-be-transmitted data, which improves resource utilization of a routing network.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • HUAWEI TECHNOLOGIES CO., LTD.

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Fu, Binzhang Beijing, CN 10 21

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Aug 27, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Aug 27, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00