Joint-free concrete

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9909307
SERIAL NO

15136894

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Method of forming a concrete slab to reduce or eliminate control joints includes preparing a substantially flat base, overlaying one or more barriers on top of the base, placing a concrete mixture on top of the barrier(s) and base to form a concrete slab, and allowing the concrete to cure without forming control joints. The base is prepared with a flatness of about ±¼ inch over 10 feet. A side edge is prepared along a periphery of the concrete slab by extending a vapor barrier from a bottom surface of the slab up the side edge toward a top surface of the slab and covering the side edge. A plurality of post-tensioning cables are positioned to extend through the slab and configured to compress and assist in controlling accelerated displacement of the concrete slab during curing and shrinkage. The concrete slab is formed of an evenly gradated and low slump concrete having high fiber content, minimized cement content, and maximized size of large aggregate.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • HUGHES GENERAL CONTRACTORS

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Pratt, Daniel J Farmington, US 6 5

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Sep 6, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Sep 6, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00