Quantum otto engine

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9909460
SERIAL NO

15008263

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Systems and methods for operating a quantum Otto cycle, including a superconducting LC resonator circuit electrically coupled to an input control unit with a reservoir source and a waveform generator configured to generate a bias current. A superconducting flux qubit is coupled to the LC resonator via a superconducting quantum interference device (“SQUID”). The SQUID generates a flux in the presence of the bias current, and the flux generated by the SQUID mediates a coupling rate between the flux qubit and the LC resonator. The waveform generator alternates the bias current to adiabatically change the coupling rate between the flux qubit and the LC resonator during adiabatic stages of the quantum Otto cycle. The reservoir source sends pulses to thermalize the flux qubit and the LC resonator system during isochoric stages of the quantum Otto cycle.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
KOC UNIVERSITYRUMELI FENERI YOLU SARIYER 34450

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Allen, Edward Henry Bethesda, US 15 66
Altintas, Ferdi Istanbul, TR 1 13
Hardal, Ali U Cemal Istanbul, TR 1 13
Müstecaplioglu, Özgür Istanbul, TR 1 13

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Sep 6, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Sep 6, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00