System and method of synchronizing time between multiple systems

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9910419
SERIAL NO

14021287

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Systems and methods for synchronizing time between multiple systems on a mining machine. The system includes a programmable logic controller (PLC) for controlling the mining machine and for transmitting a time to synchronize computer subsystems on the machine. The PLC includes a system clock that is programmed to operate on local time. A battery pack is connected to the PLC to allow the system clock to function continuously, even when the machine is turned off. Computer subsystems request and receive time updates from the PLC. A local time on each computer subsystem is determined based on the time update received from the PLC. Each computer subsystem includes a time zone parameter set to Coordinated Universal Time (UTC) and a Daylight Saving Time (DST) parameter that is disabled. Accordingly, the local time on each computer subsystem is set to the time update value received from the PLC.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • HARNISCHFEGER TECHNOLOGIES, INC.

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Basulto, Jorge A Oconomowoc, US 1 1
Payne, Charles D Mukwonago, US 2 13

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Sep 6, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Sep 6, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00