Water jet peening device

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9914186
SERIAL NO

14652531

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The water jet peening device of the present invention is provided with: a swiveling mechanism for swiveling a spray nozzle in the horizontal direction centered on a positioning member that is positioned at the upper end of an instrumentation tube support; a lift mechanism for raising and lowering the spray nozzle in the vertical direction with respect to the positioning member that is positioned at the upper end of the instrumentation tube support; and a rotation mechanism for supporting the spray nozzle so as to be able to rotate centered on a downward-inclined rotation shaft center on the positioning member end of the vertical direction, disposing a spray port aimed toward the side of the rotation shaft center in a direction that is at a slant from the rotation shaft center, and rotating the spray nozzle centered on the rotation shaft center.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
MITSUBISHI HEAVY INDUSTRIES LTD2-3 MARUNOUCHI 3-CHOME CHIYODA-KU TOKYO 100-8332

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Hinami, Kazuyuki Tokyo, JP 4 3
Kawanishi, Kenichi Tokyo, JP 5 4

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Sep 13, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Sep 13, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00