Recovery and re-use of waste energy in industrial facilities

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9915477
SERIAL NO

15242100

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Configurations and related processing schemes of specific inter-plants and hybrid, intra- and inter-plants waste heat recovery schemes for thermal energy consumption reduction in integrated refining-petrochemical facilities synthesized for grassroots medium grade crude oil semi-conversion refineries to increase energy efficiency from specific portions of low grade waste heat sources are described. Configurations and related processing schemes of specific inter-plants and hybrid, intra- and inter-plants waste heat recovery schemes for thermal energy consumption reduction in integrated refining-petrochemical facilities synthesized for integrated medium grade crude oil semi-conversion refineries and aromatics complex for increasing energy efficiency from specific portions of low grade waste sources are also described.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • SAUDI ARABIAN OIL COMPANY

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Al, Saed Hani Mohammed Dhahran, SA 32 260
Noureldin, Mahmoud Bahy Mahmoud Dhahran, SA 87 627

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Sep 13, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Sep 13, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00