Vapor phase growth method of growing a film on a substrate while heating the substrate with a heating unit

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9916996
SERIAL NO

14707461

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A vapor phase growth method of growing a film on a substrate by supplying material gases to the substrate while heating the substrate with a heating unit according to an embodiment, the method includes: measuring a temperature of the substrate with a radiation thermometer; executing a temperature feedback control to control an output of the heating unit to cause a measurement value of the radiation thermometer to have a set value when a film is not grown on the substrate; and executing a constant output control to maintain an output of the heating unit constant when a film causing thin-film interference in a wavelength measured by the radiation thermometer is grown on the substrate.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
NUFLARE TECHNOLOGY INC2068-3 OOKA NAMAZU-SHI SHIZUOKA 410-8510

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Hayano, Takanori Yokohama, JP 6 5
Iijima, Tatsuhiko Numazu, JP 2 1
Sato, Yuusuke Bunkyo, JP 116 1528
Yamada, Takumi Yokohama, JP 61 122

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Sep 13, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Sep 13, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00