Superconducting single-pole double-throw switch system

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9917580
SERIAL NO

15663780

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A superconducting switch system is provided that includes a filter network having a first SQUID coupled to a second SQUID via a common node, an input port coupled to the common node, a first output port coupled to the first SQUID, and a second output port coupled to the second SQUID. The superconducting switch system also includes a switch controller configured to control an amount of induced current through the first SQUID and the second SQUID to alternately switch the first and second SQUIDS between first inductance states in which a desired bandwidth portion of a signal provided at the input terminal passes to the first output terminal and is blocked from passing to the second output terminal, and second inductance states in which the desired bandwidth portion of the input signal passes to the second output terminal and is blocked from passing to the first output terminal.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • NORTHROP GRUMMAN SYSTEMS CORPORATION

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Naaman, Ofer Ellicott City, US 55 845

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Sep 13, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Sep 13, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00