Wiring substrate

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9918378
SERIAL NO

15784296

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A wiring substrate includes a wiring layer, an insulating layer covering the wiring layer, and a protruding electrode including a protruding metal layer and a surface metal layer. The protruding metal layer is connected to the wiring layer in an opening of the insulating layer, extends from within the opening to be stepped at the edge of the opening to extend outward onto the insulating layer, and includes a first surface contacting a surface of the insulating layer around the opening, a second surface, and a peripheral surface extending between the first and second surfaces, and bent inward to form a space between the peripheral surface and the surface of the insulating layer. The surface metal layer covers the protruding metal layer without contacting the surface of the insulating layer, and is formed of a metal having a lower melting point than the protruding metal layer.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
SHINKO ELECTRIC INDUSTRIES CO LTD80 OSHIMADA-MACHI NAGANO SHI NAGANO KEN 381-2287

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Shimodaira, Tomoyuki Nagano, JP 18 82

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Sep 13, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Sep 13, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00