Conditioning garments

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9918502
SERIAL NO

14586655

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A conditioning garment has an array of tubes (11) for passing heated/cooled fluid to heat/cool a wearer of the garment. The array of tubes (11) terminate at a connector (16) for connection to a source of heated/cooled liquid. The connector (16) comprises a male part (15) and a female part (17) with a releasable latch (22, 34, 40) acting between the male and female parts (15, 17) to hold the male part (15) in engagement with the female part (17). The releasable latch includes a release member (40) moveable in a rectilinear path away from the connector (16) to release the latch and allow separation of the male part (15) from the female part (17). The male and female parts (15, 17) are self-sealing on disengagement. This allows for automatic separation of the male and female parts (15, 17) in an emergency.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
RFD BEAUFORT LIMITEDAVIATOR INDUSTRIAL PARK ERIC FOUNTAIN ROAD ELLESMERE PORT CH65 1AX

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Oliver, Alan Paul Rhyl, GB 2 2
Smith, Brendan Patrick Liverpool, GB 1 1

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Sep 20, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Sep 20, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00