Method for manufacturing turbine rotor blade

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9919392
SERIAL NO

14650738

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A method for manufacturing a turbine rotor blade wherein warping, bending and twisting of the entire rotor blade, which is provided with an excess thickness portion after a forging step, can be suppressed. In the forging step in a process for manufacturing a rotor blade (23), the forging is hot-forged such that the distance (the excess thickness amount) from the blade surface of the blade section (23) to the surface of the excess thickness section is substantially uniform along the entire periphery of a cross section of the blade section (23) and the excess thickness section (31) perpendicular to the blade length direction, and such that the amount of the excess thickness in the blade length direction, which is the thickness of the excess thickness section (31), gradually increases toward the blade tip from a prescribed position.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • MITSUBISHI HITACHI POWER SYSTEMS, LTD.

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Haraguchi, Hidetaka Tokyo, JP 10 24
Hatano, Kohei Tokyo, JP 9 12
Ishii, Ken Tokyo, JP 84 638
Kamitani, Keisuke Tokyo, JP 5 8
Machida, Motonari Tokyo, JP 7 13
Matsumura, Takumi Tokyo, JP 11 19
Ota, Takahiro Tokyo, JP 21 192
Oyama, Hiroharu Tokyo, JP 34 197

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Sep 20, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Sep 20, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00