Frac and storage tank exchanger

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9920605
APP PUB NO 20150128880A1
SERIAL NO

14526204

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

An exchanger for a tank is described herein. The exchanger may be relied upon in a trailer tank, for example, or any other type of tank that stores fluid. The exchanger includes an inlet, a central fluid conduit, one or more exchanger extension arms having fluid apertures that direct fluid into a tank at various locations, and one or more supports that support the central fluid conduit and the exchanger extension arms. The fluid apertures may be positioned relatively evenly across the exchanger extension arms and/or the central conduit to direct fluid up or at various directions into the tank. Thus, fluid pumped into the inlet of the exchanger may flow through the central conduit, into the exchanger extension arms, and out through the fluid apertures at various locations into the tank. As such, heated fluid, for example, may be more evenly and quickly distributed into the tank.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • HYDRA HEATING INDUSTRIES, LLC

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Hoffman, Michael Atlanta, US 73 520

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Sep 20, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Sep 20, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00