Fuel injection control system of internal combustion engine

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9920704
SERIAL NO

15027334

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

At least after off of an injection pulse of partial lift injection, a difference between a first filtered voltage being a negative terminal voltage of a fuel injection valve filtered by a first low-pass filter and a second filtered voltage being the terminal voltage filtered by a second low-pass filter is calculated, and time from a predetermined reference timing to a timing when the difference between the filtered voltages has an inflection point is calculated as voltage inflection time. Subsequently, an injection quantity corresponding to current voltage inflection time is estimated for each of injection pulse widths with a relationship between the voltage inflection time and the injection quantity, the relationship being beforehand stored for each of the injection pulse widths. A map defining the relationship between the injection pulse width and the injection quantity is created based on a result of such estimation, and a required injection pulse width corresponding to a required injection quantity is calculated using the map.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • DENSO CORPORATION

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Katsurahara, Hiroshi Kariya, JP 20 204
Satake, Nobuyuki Kariya, JP 13 118
Yanoto, Keisuke Kariya, JP 14 68

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Sep 20, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Sep 20, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00