Slewing drive apparatus for construction machine

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9920780
APP PUB NO 20160032949A1
SERIAL NO

14747233

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Provided is a slewing drive apparatus for a construction machine capable of satisfactory pump-flow-rate control regardless of change in engine speed, including a variable displacement hydraulic pump, a slewing motor, a slewing operation device, a control valve, a relief valve, and a pump-flow-rate control device that performs a relief cut control and includes: a section for detecting an engine revolution number Ne and a slewing speed of a slewing body; a section for determining a target pump flow rate Qo that is a sum of a slewing-speed correspondence flow rate Q1 and a minimum required relief flow rate Qmin; a section for determining a target pump-tilt-angle qtg obtained by dividing the target pump flow rate Qo by the detected engine revolution number Ne; and a section for adjusting an actual pump-tilt-angle of the hydraulic pump so as to bring the actual pump-tilt-angle to the target pump-tilt-angle qtg.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
KOBELCO CONSTRUCTION MACHINERY CO LTDHIROSHIMA-SHI HIROSHIMA 731-5161

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Izuka, Takaaki Hiroshima, JP 4 19
Ueda, Koji Hiroshima, JP 191 1495

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Sep 20, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Sep 20, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00