Dynamically selecting master clock to manage non-linear simulation clocks

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9922148
SERIAL NO

14533982

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Systems and methods that efficiently simulate controlled systems are presented. A simulation management component (SMC) controls simulation of a controlled system by controlling a desired number of nodes, each comprising a controller (e.g., soft controller) and a simulated component or process, which are part of the controlled system. The simulation can be performed in a step-wise manner, wherein the simulation can comprise a desired number of steps of respectively desired lengths of time. For each step, the SMC dynamically selects a desired clock (e.g., currently identified slowest clock) as a master clock for the next step. The SMC predicts a length of time of the next step to facilitate setting a desired length of time for the next step based in part on the predicted length of time. As part of each step, components can synchronously exchange data via intra-node or inter-node connections to facilitate simulation.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • ROCKWELL AUTOMATION TECHNOLOGIES, INC.

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Hall, Kenwood H Hudson, US 140 4198
Maturana, Francisco P Mayfield Heights, US 65 1773

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Sep 20, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Sep 20, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00