Electronic component, leadframe, and method for producing an electronic component

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9922907
SERIAL NO

15327009

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

An electronic component, a leadframe, and a method for producing an electronic component are disclosed. In an embodiment, the electronic component includes a housing and a leadframe section partly embedded in the housing, wherein the leadframe section includes a first quadrant, a second quadrant, a third quadrant and a fourth quadrant, wherein each of the quadrants has a first leadframe part and a second leadframe part, wherein each first leadframe part includes a chip landing area, wherein the chip landing areas of all four quadrants are arranged adjacently to a common central region of the leadframe section, and wherein the four quadrants are configured symmetrically with respect to one another.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • OSRAM OPTO SEMICONDUCTORS GMBH

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Gruber, Stefan Bad Abbach, DE 36 281
Richter, Daniel Bad Abbach, DE 65 57
Ziereis, Christian Lappersdorf, DE 4 4
Zitzlsperger, MIchael Regensburg, DE 56 247

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Sep 20, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Sep 20, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00