Semiconductor device and method of manufacturing semiconductor device

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9922928
SERIAL NO

15217983

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Properties of a semiconductor device are improved. A semiconductor device is configured so as to have a protective film provided over an interconnection and having an opening, and a plating film provided in the opening. A slit is provided in a side face of the opening, and the plating film is also disposed in the slit. Thus, the slit is provided in the side face of the opening, and the plating film is also grown in the slit. This results in a long penetration path of a plating solution during subsequent formation of the plating film. Hence, a corroded portion is less likely to be formed in the interconnection (pad region). Even if the corroded portion is formed, a portion of the slit is corroded prior to the interconnection (pad region) at a sacrifice, making it possible to suppress expansion of the corroded portion into the interconnection (pad region).

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • RENESAS ELECTRONICS CORPORATION

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Tonegawa, Takashi Ibaraki, JP 17 85

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Sep 20, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Sep 20, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00