Process for producing a structure by assembling at least two elements by direct adhesive bonding

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9922953
SERIAL NO

15121855

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A method for producing a structure by direct bonding of two elements, the method including: production of the elements to be assembled and assembly of the elements. The production of the elements to be assembled includes: deposition on a substrate of a TiN layer by physical vapor deposition, and deposition of a copper layer on the TiN layer. The assembly of the elements includes: polishing the surfaces of the copper layers intended to come into contact so that they have a roughness of less than 1 nm RMS and hydrophilic properties, bringing the surfaces into contact, and storing the structure at atmospheric pressure and at ambient temperature.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • COMMISSARIAT A L'ENERGIE ATOMIQUE ET AUX ENERGIES ALTERNATIVES

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Benaissa, Lamine Massy, FR 29 64
Gondcharton, Paul Grenoble, FR 10 31
Imbert, Bruno Grenoble, FR 16 48
Moriceau, Hubert Saint-Egreve, FR 93 2170

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Sep 20, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Sep 20, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00