Method for producing lithium composition and method for producing sulfide solid electrolyte material

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9923233
SERIAL NO

15172739

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A method for producing a lithium composition capable of suppressing the generation of polysulfides is provided. The method for producing a lithium composition includes a first aqueous solution forming step of forming a first aqueous solution by reacting iodine with a reducing aqueous solution containing calcium oxide, formic acid, and water under a condition of a pH of 5.5 or more and a pH of 10.21 or less through heating, a second aqueous solution forming step of forming a second aqueous solution by adding calcium oxide to the first aqueous solution, a third aqueous solution forming step of forming a third aqueous solution by adding lithium carbonate to the second aqueous solution, and a Li2S forming step of forming the lithium sulfide (Li2S) by sulfurizing lithium hydroxide (LiOH) to form lithium hydrosulfide (LiHS) and then eliminating hydrogen sulfide from lithium hydrosulfide (LiHS).

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
TOYOTA JIDOSHA KABUSHIKI KAISHATOYOTA-SHI AICHI-KEN 471-8571

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Doi, Takayoshi Toyota, JP 32 219
Hashimoto, Yuichi Numazu, JP 96 1404
Yanagi, Takuo Toyota, JP 19 73

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Sep 20, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Sep 20, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00