PCB connector footprint

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9923309
SERIAL NO

15417383

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A PCB includes a substrate having a connector surface with a PCB connector footprint defined along a longitudinal axis and a lateral axis and subdivided into PCB column grouping footprints extending generally parallel to the longitudinal axis. The PCB includes signal vias arranged in pairs along a signal pair axis with a plurality of pairs of signal vias in each PCB column grouping footprint. The signal pair axis is non-parallel to the longitudinal axis, non-parallel to the lateral axis and intersects the longitudinal axis at a lesser angle than the signal pair axis intersects the lateral axis. The PCB includes ground vias at least partially through the substrate. The ground vias are arranged around each of the pairs of signal vias to provide electrical shielding around each of the pairs of signal vias.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • TE CONNECTIVITY CORPORATION;TYCO ELECTRONICS JAPAN G.K.

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Aizawa, Masayuki Machida, JP 35 328
Morgan, Chad William Carneys Point, US 103 1425
Shirai, Hiroshi Tokorozawa, JP 98 714

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Sep 20, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Sep 20, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00