Chute for cement truck and method of fabricating a chute for a cement truck

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9925690
SERIAL NO

15505500

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A chute assembly for directing cement from a cement truck is disclosed. The chute comprises an elongate chute of generally u-shaped cross section fabricated from UHMWPe and comprising an upper end and a lower end, a plurality of reinforcing rods arranged along a length of and encased within the UHMWPe, one end of each of the rods adjacent the upper end and another end of each of the rods adjacent the lower end, a pair of u-shaped collars, an upper one of the collars adjacent the upper end and a lower one of the collars adjacent the lower end, and a fastener for securing each of the collars to their respective rod ends. A method of fabrication is also disclosed.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
GROUPE PPD INCWATERVILLE QUÉBEC J0B 3H0

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Morrissette, Sylvain Sherbrooke, CA 4 46

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Sep 27, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Sep 27, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00