Method and apparatus for producing metal by electrolytic reduction

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9926636
SERIAL NO

14655012

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A method is provided for producing metal by electrolytic reduction of a feedstock comprising an oxide of a first metal. The method comprises the steps of arranging the feedstock in contact with a cathode and a molten salt within an electrolysis cell, arranging an anode in contact with the molten salt within the electrolysis cell, and applying a potential between the anode and the cathode such that oxygen is removed from the feedstock. The anode comprises a second metal, which at the temperature of electrolysis within the cell is a molten metal. The second metal is a different metal to the first metal. Oxygen removed from the feedstock during electrolysis reacts with the molten second metal to form an oxide comprising the second metal. Thus, oxygen is not evolved as a gas at the molten anode.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
METALYSIS LIMITEDWATH UPON DEARNE ROTHERHAM S63 5DB

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Doughty, Greg Rotherham, GB 8 7

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Sep 27, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Sep 27, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00