Dielectric ceramic composition and multilayer ceramic capacitor containing the same

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9928959
SERIAL NO

15065553

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A dielectric ceramic composition and a multilayer ceramic capacitor containing the same are provided. The dielectric ceramic composition contains a base material powder represented by (1−x)BaTiO3−xPbTiO3 containing a first main ingredient represented by BaTiO3 and a second main ingredient represented by PbTiO3, wherein x satisfies 0.0025≤x≤0.4. The multilayer ceramic capacitor includes a ceramic body in which dielectric layers containing the dielectric ceramic composition are alternately stacked with first and second internal electrodes, and first and second external electrodes formed on both end portions of the ceramic body and respectively electrically connected to the first and second internal electrodes.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
SAMSUNG ELECTRO-MECHANICS CO LTDGYEONGGI DO KOREA SUWON SUWON GYEONGGI-DO

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Kim, Dong Hun Suwon-si, KR 69 562
Nam, Chan Hee Suwon-si, KR 17 44
Park, Jung Deok Suwon-si, KR 14 32
Seo, Jung Wook Suwon-si, KR 80 367
Wi, Sung Kwon Suwon-si, KR 132 1069
Yoon, Seok Hyun Suwon-si, KR 80 726

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Sep 27, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Sep 27, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00