Inductor protection during fast transient response in isolated voltage converters

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9929663
SERIAL NO

15445595

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Techniques are provided for controlling power switches that couple an input power source to a transformer within a voltage converter, in order to control the power transfer through the transformer and to a load of the voltage converter. Different techniques are provided for different operational modes. In an initial steady-state interval, the switches are switched using a fixed first switching period and variable duty cycle. Upon detecting a load transient, e.g., a sudden increase in the load power requirements, a ramp-up interval is entered during which the switches are switched using a second switching period and a second duty cycle, in order to increase the output current of the converter at a maximum rate. Upon detecting that a current within the voltage converter has reached a maximum allowed level, a current-limited interval is entered during which the switches are switched using a third switching period and a third duty cycle.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
INFINEON TECHNOLOGIES AUSTRIA AG9500 VILLACH

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Babazadeh, Amir Laguna Hills, US 52 540
Tschirhart, Darryl Torrance, US 33 195

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Sep 27, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Sep 27, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00