Method for controlling three phase equivalent voltage of multilevel inverter

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9929676
SERIAL NO

15353137

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Provided is a method of controlling a three phase equivalent voltage in a multilevel inverter including sensing a state of each of power cells of the multilevel inverter to determine whether or not failure occurs at each of the power cells, bypassing power cells which are determined as being failed to connect power cells operating normally to each other in series per each phase, calculating an offset voltage value using a phase voltage reference per each phase and a sum of each of direct current (DC) link voltages of the power cells which operate normally and configure each of the phases, and calculating a pole voltage reference per each phase for maintaining an equivalence of a three phase line-to-line output voltage using the phase voltage reference per each phase and the calculated offset voltage.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
LSIS CO LTDLS TOWER 127 LS-RO DONGAN-GU ANYANG-SI GYEONGGI-DO

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Lee, Hak-Jun Gyeonggi-do, KR 12 25

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Sep 27, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Sep 27, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00