Water pipe bowl assembly

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9930911
SERIAL NO

14321815

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A water pipe bowl assembly includes a hollow adapter having a connector and an opposed insert, and a bowl support extends radially outward from hollow adapter between the connector and the insert. A hollow bowl fixture is positioned on the bowl support and over the insert, and includes inwardly-directed upper flange encircling the closed outer end of the insert, an inwardly-directed lower flange encircling the inner end of the insert, and a smoke-collection chamber between the upper and lower flanges through which the insert extends from the inner end to the closed outer end. The upper flange and the closed outer end of the insert form a bowl for receiving a substance to be smoked and a smoke-inhalation pathway from the bowl to the smoke-collection chamber, and the opening through insert is for transferring inhalation smoke from the smoke-collection chamber to the hollow adapter.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
WRIGHT NATHANIEL MNot Provided

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Wright, Nathaniel M Haiku-Pauwela, US 2 4

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Oct 3, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Oct 3, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00