Connector for connecting a wiper blade and a wiper arm

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9932016
APP PUB NO 20160176383A1
SERIAL NO

14967104

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A connector for connecting a wiper arm to a wiper blade may be provided. The connector according to an embodiment of the present invention includes: an adaptor which includes an opening and to which the wiper arm is fastened; and a cover part which covers at least a portion of the opening and is pivotably connected to an end of the adaptor. The cover part includes: a top surface is formed in a longitudinal direction of the connector; and a wing surface which extends downward from the top surface. Accordingly, the cover part can be prevented from being separated and can be prevented from being pushed outward in a width direction of the connector, so that a U-hook of the wiper arm is prevented from being separated and the wiper arm is connected to the wiper blade with a sense of unity.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
KBWS CORPORATION16 SEONGSEOGONGDAN-RO 25-GIL DALSEO-GU DAEGU

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Lee, Woo Sung Daegu, KR 61 578

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Oct 3, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Oct 3, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00