Method and system for flotation separation in a magnetically controllable and steerable medium

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9932525
SERIAL NO

14380609

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The present invention provides new techniques related to magnetically controllable and/or steerable froth for use in separation processes of mineral-bearing ore and bitumen. Apparatus is provided featuring a processor configured to contain a fluidic medium having a material-of-interest and also having a surfactant with magnetic properties so as to cause the formation of a froth layer that contains at least some of the material-of-interest and is magnetically responsive; and a magnetic field generator configured to generate a magnetic field and provide non-mechanical mixing and steering/driving of the froth layer in the processor. The material-of-interest may be mineral-bearing ore particles or bitumen. The processor includes a flotation tank, a primary separation vessel (PSV), or a pipe, including a tailings pipeline. The pipe has a non-magnetic pipe section, and the magnetic field generator includes a magnetic coil arranged in relation to non-magnetic pipe section to generate the magnetic field and provide the non-mechanical mixing and steering/driving of the froth layer in the pipe.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
CIDRA CORPORATE SERVICES INC50 BARNES PARK NORTH WALLINGFORD CT 06492

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Kersey, Alan D South Glastonbury, US 186 4756

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Oct 3, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Oct 3, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00