Electrohydraulic implement pressure cutoff

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9932996
APP PUB NO 20170175781A1
SERIAL NO

14971235

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

An electrohydraulic implement pressure cutoff system is disclosed that includes a pump, one or more hydraulic functions, at least one valve, sensors and control unit. The pump powers the functions, and the valves control flow between the pump and their associated function. The sensor readings indicate system parameters. The control unit receives the readings and controls the valves. When the readings indicate a function is at or beyond a threshold, the control unit closes the associated valve to prevent flow to or from that function. The sensors can be pressure, position or other types of sensors. Operator control signals can be provided to control the functions. When the readings indicate a function is at or beyond a threshold in a stalled direction and the operator signals keep commanding the function in the stalled direction, the control unit can close the associated valve regardless of the operator signals.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
DEERE & COMPANYONE JOHN DEERE PLACE JOEL S CARTER MOLINE IL 61265

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Gratton, Michael R Dubuque, US 21 84
Kenkel, Aaron R East Dubuque, US 32 94

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Oct 3, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Oct 3, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00