Hydrocarbon gas processing

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9933207
SERIAL NO

12772472

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A process and an apparatus are disclosed for a compact processing assembly to recover ethane, ethylene, and heavier hydrocarbon components from a hydrocarbon gas stream. The gas stream is cooled and divided into first and second streams. The first stream is further cooled, expanded to lower pressure, heated, and its liquid fraction is supplied as a first top feed to an absorbing means. The second stream is expanded to lower pressure and supplied as a bottom feed to the absorbing means. A distillation vapor stream from the absorbing means is combined with the vapor fraction of the first stream, then cooled by the expanded first stream to form a condensed stream that is supplied as a second top feed to the absorbing means. A distillation liquid stream from the bottom of the absorbing means is heated in a heat and mass transfer means to strip out its volatile components.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
UOP LLC25 EAST ALGONQUIN ROAD DES PLAINES IL 60017-5017

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Cuellar, Kyle T Katy, US 50 1702
Hudson, Hank M Midland, US 75 3370
Johnke, Andrew F Beresford, US 22 527
Lewis, W Larry Houston, US 23 497
Lynch, Joe T Midland, US 36 1175
Wilkinson, John D Midland, US 76 3491

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Oct 3, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Oct 3, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00