Multi-layer electrophotographic photosensitive member, process cartridge, and image forming apparatus

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9933712
SERIAL NO

15247373

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A multi-layer electrophotographic photosensitive member includes a conductive substrate and a photosensitive layer. The photosensitive layer includes a charge generating layer and a charge transport layer. The charge generating layer contains a charge generating material. The charge transport layer contains a hole transport material and a binder resin. The charge generating material contains a titanyl phthalocyanine that exhibits a main peak at a Bragg angle (2θ±0.2°) of 27.2° in a CuKα characteristic X-ray diffraction spectrum. The hole transport material contains a triarylamine derivative represented by generic formula (1). The hole transport material has a mass ratio of at least 0.30 and no greater than 0.55 relative to the binder resin in the charge transport layer. In general formula (1), R1, R2, l, and m are the same as those defined in the specification.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
KYOCERA DOCUMENT SOLUTIONS INCOSAKA

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Azuma, Jun Osaka, JP 79 615
Ogata, Akihiko Osaka, JP 10 23
Okada, Hideki Osaka, JP 148 614
Okawa, Kensuke Osaka, JP 15 23

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Oct 3, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Oct 3, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00