Host node device and methods for use therewith

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9935703
SERIAL NO

15070003

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Aspects of the subject disclosure may include, for example, a host node device having a terminal interface that receives downstream channel signals from a communication network and send upstream channel signals to the communication network. An access point repeater launches the downstream channel signals as guided electromagnetic waves on a guided wave communication system and to extract a first subset of the upstream channel signals from the guided wave communication system. A radio wirelessly transmits the downstream channel signals to at least one client node device and to wirelessly receive a second subset of the upstream channel signals from the at least one client node device. Other embodiments are disclosed.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • AT&T INTELLECTUAL PROPERTY I, L.P.

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Barnickel, Donald J Flemington, US 480 81198
Barzegar, Farhad Branchburg, US 586 91835
Bennett, Robert Southold, US 600 81957
Gerszberg, Irwin Kendall Park, US 705 101562
Henry, Paul Shala Holmdel, US 643 101961
Willis,, III Thomas M Tinton Falls, US 545 92391

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Oct 3, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Oct 3, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00