Conversion of natural gas to liquid form using a rotation/separation system in a chemical reactor

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9937479
SERIAL NO

14592676

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A system and method are provided for the separation of hydrogen from natural gas feedstock to form hydrocarbon radicals. Aspects of the system include perpendicular magnetic and electric fields, a method of radical formation that separates hydrogen from the reaction process, and a separation method based on centrifugal forces and phase transitions. The gases rotate in the chamber due to the Lorentz force without any mechanical motion. Rotation separates gases and liquids by centrifugal force. The lighter species are collected from the mid region endpoint of the apparatus and fed back for further reaction. A new concept of controlled turbulence is introduced to mix various species. A novel magnetic field device is introduced comprised of two specially magnetized cylinders. A novel control of temperatures, pressures, electron densities and profiles by, RF, microwaves, UV and rotation frequency are possible especially when atomic, molecular, cyclotron resonances are taken into account. The electrodes can be coated with catalysts; the entire apparatus can be used as a new type of chemical reactor.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • Assignment data not available. Check PTO

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Wong, Alfred Y Los Angeles, US 59 848

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Oct 10, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Oct 10, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00