Automated accumulator

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9938079
SERIAL NO

15424757

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

An automated accumulator incorporates independently operated infeed and outfeed ramps. These ramps on an internal end provide access to a plurality of storage flights that define a stacked conveyor, allowing both the upstream and downstream portions of the production line to operate relatively independently of the other. On the external end, the ramps couple to prior art conveyor systems. The automated accumulator incorporates an electronic control system combining a Programmable Logic Controller (PLC) or equivalent and a plurality of sensors in combination with various motors to provide suitable automated operation, including First In First Out (FIFO) operation to preserve production sequence. In addition, various techniques may be used to selectively control operation of the automated accumulator, providing such functions as stopping infeed on a particular product, or providing linear bypass through the accumulator.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
NORTH CENTRAL GARAGE DOOR COMPANY INC900 CARR LAKE RD SE BEMIDJI MN 56601

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Vogel, Jason D Bemidji, US 1 2

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Oct 10, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Oct 10, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00