Hematite manufacturing process and hematite manufactured by same

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9938158
SERIAL NO

14898710

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Magnesium oxide produced by a process is used as a neutralizing agent for preliminary neutralization treatment of a leached slurry obtained by leaching a nickel oxide ore at a high temperature and pressure with sulfuric acid added. A neutralizing agent is added to a leachate, obtained by leaching a nickel oxide ore, to separate impurities, and a sulfurizing agent is added to the resulting neutralized solution to obtain nickel and cobalt sulfides, followed by separating the sulfurized solution; discharge waste water, obtained by adding a neutralizing agent to the sulfurized solution to separate aluminum and manganese, is concentrated to precipitate and separate calcium contained in the discharge waste water as calcium sulfate; the resulting solution is concentrated to precipitate magnesium in the solution as magnesium sulfate; the magnesium sulfate is roasted with a reducing agent to obtain magnesium oxide and a sulfurous gas; and the magnesium oxide is washed.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
SUMITOMO METAL MINING CO LTDTOKYO 105-8716

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Ohara, Hideki Ehime, JP 21 21
Ozaki, Yoshitomo Ehime, JP 48 128

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Oct 10, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Oct 10, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00