Method for manufacturing NdFeB rare earth permanent magnetic device with composite plating

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9938625
SERIAL NO

14662235

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A method for manufacturing a NdFeB rare earth permanent magnetic device with composite plating includes steps of: firstly melting alloy, casting the alloy in a melted state onto a rotation copper roller with a water cooling function, so as to be cooled for forming alloy flakes; hydrogen decrepitating; mixing after hydrogen decrepitating; jet milling after mixing; mixing under nitrogen protection before molding in a nitrogen protection magnetic field pressing machine, and then packing in a protection tank before being moved out of the protection tank and isostatic pressing; sintering in a sintering device and aging for forming a NdFeB rare earth permanent magnet; machining for forming a NdFeB rare earth permanent magnetic device; and plating the NdFeB rare earth permanent magnetic device, wherein three layers of plated films are formed.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
SHENYANG GENERAL MAGNETIC CO LTDSHENYANG LIAONING 110179

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Chen, Xiaodong Liaoning, CN 87 532
Sun, Baoyu Liaoning, CN 24 95

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Oct 10, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Oct 10, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00