Cooling water passage structure of internal combustion engine

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9938881
SERIAL NO

15058871

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A cooling water passage structure of internal combustion engine includes a cylinder-block-side cooling water passage, a cylinder-head-side cooling water passage, a heat exchanger, and cooling water passage pipes. The cylinder-block-side cooling water passage is formed inside a cylinder block of an engine to cause cooling water to flow through. The cylinder-head-side cooling water passage is formed inside a cylinder head to cause cooling water to flow through. The heat exchanger is configured to dissipate heat of cooling water to external air to decrease a temperature of the cooling water. The cooling water passage pipes couple the heat exchanger and the engine to exchange cooling water. The cylinder head includes a cooling water inlet. The cooling water passage pipe is coupled to the cooling water inlet. The cooling water from the heat exchanger flows into the cooling water inlet.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
SUZUKI MOTOR CORPORATION300 TAKATSUKA-CHO MINAMI-KU HAMAMATSU-SHI SHIZUOKA-KEN

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Yamada, Ikuo Hamamatsu, JP 49 533

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Oct 10, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Oct 10, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00