Bipolar battery and plate

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9941546
SERIAL NO

13229310

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A bipolar battery plate is utilized for production of a bipolar battery. The bipolar battery plate includes a frame, a substrate, first and second lead layers, and positive and negative active materials. The substrate includes insulative plastic with conductive particles homogeneously dispersed throughout the insulative plastic and exposed along surface of the substrate, the substrate positioned within the frame. The first lead layer is positioned on one side of the substrate, while the second lead layer is positioned on another side of the substrate. The first and second lead layer are electrically connected to each through the conductive particles. The positive active material is positioned on a surface of the first lead layer, and the negative active material positioned on a surface of the second lead layer.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
WELLS FARGO BANK NATIONAL ASSOCIATION100 PARK AVENUE NEW YORK NY 10017

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Faust, Thomas Wyomissing, US 12 123

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Oct 10, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Oct 10, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00