Automated data center

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9943960
SERIAL NO

15425641

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

An automated data center management system includes one or more equipment racks housing at least one server farm equipment, each of the at least one server farm equipment having a respective attachment point, a spare equipment repository having at least one replacement equipment, and a hardware management robot. The hardware management robot includes a robotic arm having an interface point, the interface point configured to couple to the attachment point. A hardware management controller is communicates with the hardware management robot, the hardware management controller including at least one processor, and non-transitory computer readable media having encoded thereon computer software comprising a set of instructions to receive a service request indicating a server farm equipment needing service, determine a location of the server farm equipment, generate a path to the location of the server farm equipment, and transmit the path to the hardware management robot.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • CENTURYLINK INTELLECTUAL PROPERTY LLC

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Morrill, Robert J Overland Park, US 112 8798
Wray, Jared E Bellevue, US 3 75

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Oct 17, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Oct 17, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00