Lignite drying in a lignite fired power plant with a heat pump

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9944875
SERIAL NO

15163159

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The invention relates to a lignite fired steam power plant comprising a water/steam power cycle and a lignite dryer system having a heat pump circuit configured and arranged to provide heat energy to a lignite dryer of the dryer system. The heat pump includes a dryer heat exchanger, an expansion device and an evaporator heat exchanger connected to the first outlet line so as to enable heat energy transfer from the vapour of the first outlet line to the first working fluid. A compressor is also included in the heat pump circuit. In addition the heat pump circuit is connected to the water/steam power cycle by a steam makeup line from the pressure series of steam turbines and a condensate return line.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
ALSTOM TECHNOLOGY LTDBROWN BOVERI STRASSE 7 5400 BADEN

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Edel, Thomas Colmar, FR 4 13
Geiger, Frederic Giromagny, FR 10 21
Pourchot, Thierry Naves Parmclan, FR 8 17
Wantz, Didier Bavilliers, FR 4 13

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Oct 17, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Oct 17, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00