Method for recovering an acid from acid/sugar solutions

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9945000
SERIAL NO

15133529

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Acid hydrolysis of biomass is an important step for releasing the component sugars before converting them to fuels and/or biochemicals. During such a process, a significant amount of mineral acid, such as sulfuric acid, is used. In most cases, the residual acid is neutralized with lime before the sugar conversion step. By doing so, a waste calcium sulphate stream is generated and sent to disposal. The efficient separation of acid from the sugars would allow the recycle of the acid and make the entire process more economically viable. We found that a resin bed packed with an acid retardation resin can be used to achieve an efficient separation (i.e. 98.5% recovery of the acid) of the sulfuric acid from the sugars. The resin bed can be simply regenerated with water.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
FPINNOVATIONSPOINTE-CLAIRE QC H9R 3J9

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Jemaa, Naceur Pointe-Claire, CA 10 15
Mahmood, Talat Kirkland, CA 3 0
Paleologou, Michael Beaconsfield, CA 28 166

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Oct 17, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Oct 17, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00